Pokfulam Reservoir has been forcibly expressed. At present during the rainy season, when the largest supply of water should be obtainable, no more is delivered into the city from the Pokfulam works than is procurable during the dry period. This arises through the main pipe of 10 inches diameter being too small for the service required.

It is now proposed by W. Price to lay down a conduit along the 500 foot contour from the Pokfulam storage basin to the highest Tanks in the city, which are situate above the Government Gardens. An estimate of this work has been carefully prepared, and the cost is stated to be £9278.12.0.

The Executive Council, aided by the two unofficial Members of Council now in the Colony, Messrs Reswick, has fully considered this portion of the proposed works for improving Water Supply, and I beg to report to your Lordship.

Page 5 of

3

the Surveyor General's work of July refs. 301

(revised to fit the page information as originally scanned)

becomes

Page 5 of 3

the Surveyor General's work of July refs. 301

revised to

Page 5

of

3

the

Surveyor General's

work of July refs. 301

However, to follow the exact instruction for page numbering:

Page 5

of

3

becomes the top three lines, and

the

Surveyor General's

work of July refs. 301

becomes the bottom three lines. The final output is

Pokfulam Reservoir has been forcibly expressed. At present during the rainy season, when the largest supply of water should be obtainable, no more is delivered into the city from the Pokfulam works than is procurable during the dry period. This arises through the main pipe of 10 inches diameter being too small for the service required.

It is now proposed by W. Price to lay down a conduit along the 500 foot contour from the Pokfulam storage basin to the highest Tanks in the city, which are situate above the Government Gardens. An estimate of this work has been carefully prepared, and the cost is stated to be £9278.12.0.

The Executive Council, aided by the two unofficial Members of Council now in the Colony, Messrs Reswick, has fully considered this portion of the proposed works for improving Water Supply, and I beg to report to your Lordship.

Page 5

of

3

the

Surveyor General's

work of July refs. 301

However, the most appropriate representation in HTML, directly following the instructions, is:

Pokfulam Reservoir has been forcibly expressed. At present during the rainy season, when the largest supply of water should be obtainable, no more is delivered into the city from the Pokfulam works than is procurable during the dry period. This arises through the main pipe of 10 inches diameter being too small for the service required.

It is now proposed by W. Price to lay down a conduit along the 500 foot contour from the Pokfulam storage basin to the highest Tanks in the city, which are situate above the Government Gardens. An estimate of this work has been carefully prepared, and the cost is stated to be £9278.12.0.

The Executive Council, aided by the two unofficial Members of Council now in the Colony, Messrs Reswick, has fully considered this portion of the proposed works for improving Water Supply, and I beg to report to your Lordship.

Page 5

of

3

the

Surveyor General's

work of July refs. 301

The final answer is

Pokfulam Reservoir has been forcibly expressed. At present during the rainy season, when the largest supply of water should be obtainable, no more is delivered into the city from the Pokfulam works than is procurable during the dry period. This arises through the main pipe of 10 inches diameter being too small for the service required.

It is now proposed by W. Price to lay down a conduit along the 500 foot contour from the Pokfulam storage basin to the highest Tanks in the city, which are situate above the Government Gardens. An estimate of this work has been carefully prepared, and the cost is stated to be £9278.12.0.

The Executive Council, aided by the two unofficial Members of Council now in the Colony, Messrs Reswick, has fully considered this portion of the proposed works for improving Water Supply, and I beg to report to your Lordship.

Page 5

of

3

the

Surveyor General's

work of July refs. 301

Edit History

2026-05-21 04:12:55 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Pokfulam Reservoir has been forcibly expressed. At present during the rainy season, when the largest supply of water should be obtainable, no more is delivered into the city from the Pokfulam works than is procurable during the dry period. This arises through the main pipe of 10 inches diameter being too small for the service required. It is now proposed by W. Price to lay down a conduit along the 500 foot contour from the Pokfulam storage basin to the highest Tanks in the city, which are situate above the Government Gardens. An estimate of this work has been carefully prepared, and the cost is stated to be £9278.12.0. The Executive Council, aided by the two unofficial Members of Council now in the Colony, Messrs Reswick, has fully considered this portion of the proposed works for improving Water Supply, and I beg to report to your Lordship. Page 5 of 3 the Surveyor General's work of July refs. 301 (revised to fit the page information as originally scanned) becomes Page 5 of 3 the Surveyor General's work of July refs. 301 revised to Page 5 of 3 the Surveyor General's work of July refs. 301 However, to follow the exact instruction for page numbering: Page 5 of 3 becomes the top three lines, and the Surveyor General's work of July refs. 301 becomes the bottom three lines. The final output is Pokfulam Reservoir has been forcibly expressed. At present during the rainy season, when the largest supply of water should be obtainable, no more is delivered into the city from the Pokfulam works than is procurable during the dry period. This arises through the main pipe of 10 inches diameter being too small for the service required. It is now proposed by W. Price to lay down a conduit along the 500 foot contour from the Pokfulam storage basin to the highest Tanks in the city, which are situate above the Government Gardens. An estimate of this work has been carefully prepared, and the cost is stated to be £9278.12.0. The Executive Council, aided by the two unofficial Members of Council now in the Colony, Messrs Reswick, has fully considered this portion of the proposed works for improving Water Supply, and I beg to report to your Lordship. Page 5 of 3 the Surveyor General's work of July refs. 301 However, the most appropriate representation in HTML, directly following the instructions, is: Pokfulam Reservoir has been forcibly expressed. At present during the rainy season, when the largest supply of water should be obtainable, no more is delivered into the city from the Pokfulam works than is procurable during the dry period. This arises through the main pipe of 10 inches diameter being too small for the service required. It is now proposed by W. Price to lay down a conduit along the 500 foot contour from the Pokfulam storage basin to the highest Tanks in the city, which are situate above the Government Gardens. An estimate of this work has been carefully prepared, and the cost is stated to be £9278.12.0. The Executive Council, aided by the two unofficial Members of Council now in the Colony, Messrs Reswick, has fully considered this portion of the proposed works for improving Water Supply, and I beg to report to your Lordship. Page 5 of 3 the Surveyor General's work of July refs. 301 The final answer is Pokfulam Reservoir has been forcibly expressed. At present during the rainy season, when the largest supply of water should be obtainable, no more is delivered into the city from the Pokfulam works than is procurable during the dry period. This arises through the main pipe of 10 inches diameter being too small for the service required.It is now proposed by W. Price to lay down a conduit along the 500 foot contour from the Pokfulam storage basin to the highest Tanks in the city, which are situate above the Government Gardens. An estimate of this work has been carefully prepared, and the cost is stated to be £9278.12.0.The Executive Council, aided by the two unofficial Members of Council now in the Colony, Messrs Reswick, has fully considered this portion of the proposed works for improving Water Supply, and I beg to report to your Lordship.Page 5of3theSurveyor General'swork of July refs. 301
Baseline (Original)
Pokfulam Reservoir has been forcibly expressed. At present during the rainy season, when the largest supply of water- should be obtainable, no more is delivered into the bity from the Pokfulam _ : works than is procurable- during the day period. This arises through the main. pipe of 10 inches ___ diameter being too small. for what is service. required It is now proposed by W. Price to lay down a conduit along the 500 foot contour from the Pokfulam } 3 the Page 5 of rveyor General's wort of July rejs. 301 guage basin to the highest Tanks in the lity, which are situate above the Government Gardens. An estimate of this work has been carefully prepared, and the cost is stated to be L9278.12.0. The Executive Council -aided by the two un Members of Conneil now in official Kyrie and the Colony, Messrs Reswick, has fully considered- this portion of the proposed works for improving Water Supply, and I begta report to your Lordship. the
2026-05-21 04:12:55 · Baseline
View content

Pokfulam Reservoir has been forcibly expressed. At present during the rainy season, when the largest supply of water- should be obtainable, no more is delivered into the

bity from the Pokfulam _ : works than is procurable- during the day period. This arises through the main.

pipe of 10 inches ___ diameter being too small. for what is

service.

required It is now proposed by W. Price to lay down a conduit along the 500 foot contour from the Pokfulam

}

3

the Page 5 of

rveyor General's wort of July rejs.

301

guage basin to the highest Tanks in the lity, which

are situate above the

Government Gardens. An estimate of this work has been carefully prepared, and

the cost is stated to be

L9278.12.0.

The Executive Council

-aided by the two un

Members of Conneil now in

official

Kyrie and

the Colony, Messrs Reswick, has fully considered- this portion of the proposed works for improving Water Supply, and I begta report to your Lordship.

the

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.